Archive for September, 2009

As promised.

September 12, 2009

Here’s our solar array. The guy in the photo is Scottie, who beamed himself up.

Today’s other new post is just below.

A good view of the array, looking west.

A good view of the array, looking west.

Whoa, too much going on.

September 12, 2009

Final days. Big push. A slew of details are getting finished – plumbing fixtures, elevator, sprinklers, painting and more – to say nothing of our moving all our stuff. Off premise caterers are genus packratus, let me tell you.

Here are a bunch of pictures, with descriptions. Later today I’ll put up a photo or two of the solar array on the roof. For that we’ll also have a monitor in the lobby, showing how much energy we’re putting out (or, keeping in, as the case may be).

Hannah, helping The Dad stain new wood so it melds with old wood in the 2nd floor lobby.

Hannah, helping The Dad stain new wood so it melds with old wood in the 2nd floor lobby.

One of the 6 chandeliers in the loft, created by Warren Muller at bahdeebahdu.

One of the 6 chandeliers in the loft, created by Warren Muller at bahdeebahdu.

The 2nd floor lobby.

The 2nd floor lobby. Compare this with an earlier post's picture of Lynn walking the 2nd floor and you'll really see how much has been accomplished.

The view into the loft as you exit the elevator at the 2nd floor.

The view into the loft as you exit the elevator at the 2nd floor.

This is the 1st floor lobby; grout, paint and chandelier to come.

This is the 1st floor lobby; grout, paint and chandelier to come.